Monday, April 27, 2009

Oopsie

Last week we met with Jorge to go over a few details in the ever changing landscape of our home. As we did the walk through, Jorge carried around a pad of paper and pen to make various notes. One of the things we spoke about was chipping out the tile on the mantle in the living room that the runs the length of the wall.

Next day, Javier and I pass by to check something out and it turns out not only was the tile on the mantle chipped out, but also the tile in the fireplace. Oopsie! That original terra cotta tile was to remain in place. It was only suppose to be the dirty white ceramic tile that got the ax. Yikes. Uncomfortable feeling. Pissed feeling. Uh oh! So I grow an instant sack (as Javier says), snatch my cell, dial Jorge's number, he answers, I blurt out, "The tile in the fireplace is missing, gone!" He says, "Really? Huh. That shouldn't be. Well, start shopping. Pick out whatever you want, on me and we'll install it." Silence (on my part). That was easy. Honestly, I was not expecting it to go down that way, but hey, I enjoyed skipping over the argument part and going straight to the resolution part. Good guy, this GC of ours.

Today, I started shopping. I found three possibilities. Two reasonably priced stone tiles. The third, a not so reasonably priced stone tile. And wouldn't cha know it, the third is my fav! Rectangular, 2 x 3, mesh backed, multi-red onyx tile. OMG! Beautiful. So now the moral questions. Do I have him buy the ultra (yes, ultra!) expensive tile...after all, it was not my intention to spend the money on any tile, but if it's going to be done, it should be done right, right? Or, should I settle for the something-affordable-and-nice-but-not-outstanding tile because it makes me feel less guilty?

To be determined...
Note: Javier and Mina at Casa Cielo (the coolest tile place in Miami) say go for the onyx because regardless of which one I choose and the fact that Jorge said "it's on me," we'll end up paying for it somewhere along the line.

Note to the Note: I think I am including the above note because I am trying to allow myself to feel less guilty for maybe making the GC pay for the gorg onyx.

Friday, April 17, 2009

Yes, I can spend over $15,000 in one week

It's becoming too hard to keep up with all the action, and I guess that is a good thing, right! Soooooooooooo, much has happened and is happening everyday.

In no particular order:

LinkThe Titan tankless water heater was purchased ($481.50) and installed in the garage. The subfloor was put in the kitchen (looks like plywood to me). BioBased closed-cell spray foam insulation is being installed as I write (check out the photo, I think it's pretty freakin' cool - $4400). The phone and cable lines have been run throughout the house. "Fart fans" are in place. The shower valve ($210) has been installed in the Jack-n-Jill bathroom (apparently it is heavy, and heavy must be code for high quality...don't you think!). We decided on, and purchased, a low-flow bathroom sink faucet ($178), low-flow showerhead and arm flange ($137), thermostatic shower valve trim ($187), subway tile ($454.50), cove ($67.76)/bullnose ($62.16)/.25" round ($33.75) tiles, green glass tile border ($173.56), white 1" hex tile for shower floor ($112.39), an indestructible (we'll see about that) medicine cabinet ($290), Toto Aquia dual flush toilets ($274 and $352) and nifty soft close toilet seats ($54 x 2). We decided on an Ikea kitchen design (though I didn't purchase it yet), stainless steel Franke 28" single bowl, undermount sink (love the jargon - $700) and matching Franke kitchen faucet ($742.50). Today I paid for the cork tiles ($576) that will serve as our eco-friendly flooring in our kitchen. We also scouted out appliances at the awesome Sears Outlet and sliding closet doors at the not-so-awesome sliding door place. Mike, our window guy, called and said he got the permit and the install should be in about 2 weeks (2nd deposit - $5445.30). We ate our first mango from our tree (priceless, hahahahaha!). I think the bulk of the electricity and plumbing work is done. The meter box was hung on the side of the garage. The GC's crew started doing the plaster/stucco work. I just wrote another check to our contractor ($3000).

I know there is more but I simply cannot keep up. Which is a good thing, right?

Friday, April 3, 2009

Woweee

It hit me a little harder today. I own a house?! Seriously, whoa. I think it's something about seeing the construction; exposed walls, people rising up out of the crawl space, copper piping being soldered. The gem of it all was that the Jack-n-Jill bathroom was, well, gone. There was pretty much nothing there (though, not to worry, the beautiful emerald green hex tile floor was protected with cardboard) just exposed cinder blocks, wood beams and very, very old cement.

So as I walked from room to room, holding Madeline in one arm, watching my husband inspect our home with careful consideration, I couldn't help but bubble over and give into the fantasy, or perhaps reality, of it all.

Looking forward to future memories.

Crackin' up.

Left overs in the soon to be stand up shower. No tub in here anymore.

Future M & M bathroom. Door way leads into their bedroom. Shower on left. Box on the wall is where the old school heater use to be.

Spot where the sink and toilet use to be.

The Weekender

Wednesday, April 1, 2009

They Fucked Our Shit Up!

This week marked the beginning of the electrical and plumbing overhauls. Oh my, it's so exciting, walking in to our soon to be home and seeing, or rather not seeing, floors and ceilings...give me chills. I just love progress and the sight of work trucks and circular saws. Yipee!


Permits hung in the window with care.

Here's this week's run down. Our GC's crew has:

1. Tore down the wall between the kitchen and dining room.


2. Tore out the floor in the kitchen and replaced the rotted beams.


3. Tore out the ceiling in both the kitchen and dining room and replaced two ceiling beams that had bent due to settling.


4. Repiped electricity and replaced/added electrical outlets and switches per code.


5. Framed out the florida room for dry wall.


6. And finally, placed the fuse panel in the garage.



Oh, and did I tell you? We are doing the windows. They should be installed in 4-6 weeks. Happy Day.