Permits hung in the window with care.
Here's this week's run down. Our GC's crew has:
1. Tore down the wall between the kitchen and dining room.
2. Tore out the floor in the kitchen and replaced the rotted beams.
3. Tore out the ceiling in both the kitchen and dining room and replaced two ceiling beams that had bent due to settling.
4. Repiped electricity and replaced/added electrical outlets and switches per code.
5. Framed out the florida room for dry wall.
6. And finally, placed the fuse panel in the garage.
Oh, and did I tell you? We are doing the windows. They should be installed in 4-6 weeks. Happy Day.







No comments:
Post a Comment